Throughout September and October, SAMLARC will be conducting parking lot maintenance and repair projects at several parks throughout the community. These projects are necessary to protect the longevity, structure, and aesthetics of the parking lots. Work will begin on September 8th and each location will have varying closure schedules; lots may have limited access during this time. Individual parking lots will be closed for approximately one (1) day as the lots are serviced.

Schedule (barring unforeseen delays)


Phase 1: Concrete Repairs

All parks will be closed starting at 7am on the date scheduled.

· September 8-9: Altisima & Cielo Vista lots partially closed

· September 8-13: Arroyo Vista lot fully closed


Phase 2: Asphalt Demolition/Grinding/Patchback/Overlay

All parks will be closed starting at 7am on the date scheduled.